Jump to content

Search the Community

Showing results for 'process time depending on entity count'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Simio Public Forums
    • Welcome and How To Become a Simio Insider
    • Simio News and Announcements
    • Simio Product Details
    • Simio-Related Positions Desired or Positions Available
    • Help Getting Started with Simio
  • Forums for Simio Insiders Only (See Public Forums Welcome topic to sign up)
    • SI General Discussions
    • SI Sprint Releases
    • SI Shared Items
    • SI Ideas and Suggestions
    • SI Known Issues and Workarounds
    • SI Performance Tips
    • SI Non-US Cultures
    • SI Student Competition
    • SI Educational
    • SI Libraries and Objects
    • SI Animation and Visualization
    • SI Distributions, Functions, and Expressions
    • SI Simio Tabs
    • SI Experimentation and Optimization
    • SI Functional Approaches
    • SI Industries / Domains
    • SI Types of Simulation
    • SI Emulation
    • SI API

Categories

  • Files
    • Academic Information
    • Product Information
    • Case Studies

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About Me


First Name


Last Name


Company/University Name


OCCUPATION


ICQ


WEBSITE


YAHOO


AOL


LOCATION


FACEBOOK


GOOGLEPLUS


SKYPE


TWITTER


YOUTUBE

  1. Hi, Currently modeling 2 assembly lines that are identical. They have 1 source that sends Batches of Segments. How our system works is that 1 order has multiple batches, so to identify them, we added the same order number to them. https://imgur.com/a/V971F Even though the 2 assembly lines have the same machines, they operate different batches, which can be identify by the diameter of the order. If Orders are "= N" they will go to Assembly line 1 and 2. If Orders are "=Y" they can only go to Assembly line 1. I'm using a transfer node to distribute the batches into the two assembly lines to maintain max usability in both lines. The path that are from the Source to the first server and from the Transfer Node to the first server have the diameter constraints. https://imgur.com/a/9h7Kp The problem I'm facing is that the transfer node seems to be separating orders that have the same number to both lines. For example order 1234 has 10 batches, 5 are going to line 1 and 5 are going to line 2. I need, per customer request, to have all batches with the same order number be processed by the same line. Is there a way to constrain the transfer node to keep Orders with the same number together? or a Add-on Process that will allow me to do so?
  2. I have one data table to create Order entities(based on SimBit - Entity by data table). Each order has properties such as type of Part and number of Parts. Each Order entity needs to reference a Part data table (based on SimBit - Leveled Arrivals) for that type of Part to create all the part entities for that order. Each Order type has an associated Part data table. I'm not sure how to establish the relationship between the order entity and the correct part data table. Any suggestions would be appreciated. Thank you.
  3. Hi I am trying to create a model that the vehicle can pick up entities from different location based on the capacity of the Track. For now, my model will be stuck whenever the Track is full. Based on my model, I have attached a picture below. The Transfercar2 will pick up an entity from extrusion2 and drop it off at Track_2A, or pick up an entity from extrusion1 and drop it off at Track_3A. However, the transfercar2 does not know the capacity of the Track. I wonder how to do an add-on process or any other methods could fix this problem. As a result, if the Track_3A is full, the transfercar2 will go to extrusion2 to pick up an entity and drop it off at Track_2A, if the Track_2A is full, the transfercar2 will go to extrusion 1 to pick up an entity and drop it off at Track_3A. (On the picture, Track_3A is above Track_2A) Thank you.
  4. Hi, What is the best way to access entities in a queue and select entities of a certain type to be processed first? I want to do this dynamically as the model is running. Thanks!
  5. Hello everybody! I need some help to model a workers logic. I already read most of topics about workers and went through the MoveableOperator and InterruptibleWorker simbits. I have a line with 3 stations and 3 workers. The 3 of them can work at the first server. Then only 1 (that is identify) can work at the 2nd server and only another one (also identify can work at the 3rd server. I want that the 3 of them work initially at the 1st server. As soon as an entity arrive at the 2nd or 3rd server, the identify worker be seized to do the job at the correct station. After the job is done at the 2nd or 3rd station, I want the worker to be released to be seized again at the 1st station so that it help to finish th work in process at 1st server. The problem can be set in another way. Each server as an accredited worker and worker from servers 2 and 3 can be seized by the 1st server if they have no work at their own station. I've already tried several things but it never work how I wanted. The biggest problem was th e following. there is a worker that is seized by the wrong entity or entities wait to finish a process to seize a worker. So if I understand well the Simio logic and if it's possible, I need to know how to command which entity have to seize which worker and how to seize a worker during an entity is processed. Thanks in advance!!
  6. About the job Position: Industrial Simulation Services, Simulation Developer Location: Kitchener, Ontario Experience: 3-5 Years of relevant work experience Division: OTTO Motors Area of Study: Industrial/ Mechanical/ Mechatronics/ Systems Engineering NOTE: Must be able to travel to the U.S at time of application. About Clearpath Robotics Inc. Clearpath Robotics Inc. develops the future of robotics technology through development and sale of industry-leading self-driving technology, products, and services to over 500 of the world’s most innovative brands. Proprietary hardware, software, and services are delivered through the company’s research and industrial divisions: Clearpath Robotics and OTTO™ Motors. Clearpath Robotics Inc. is an award-winning company with recent awards including Robotics Business Review Top 50 Robotics Company, Edison Award for Innovation, Business Insider Top 40 under 40, and Canada’s Top 100 Employers. About Clearpath Robotics Research Solutions Clearpath Robotics’ research solutions group is a global leader in unmanned vehicle robotics for research and development, and provides hardware, software, and services to enable self-driving vehicle development, deployment, and operation. Clearpath Robotics works with over 500 of the world’s most innovative brands in over 40 countries, serving markets that span mining, military, agriculture, aerospace, and academia. Visit Clearpath Robotics atwww.clearpathrobotics.com. About OTTO™ Motors OTTO™ Motors is making material handling in industrial settings safer, easier, and more efficient through development of hardware and software that automates movement of goods in busy factories and warehouses. The company’s industry-leading self driving technology provides automated and on-demand material handling in the most demanding industrial environments, spanning automotive, medical device, aerospace, logistics, and more. Customers trusting their mission-critical material handling needs to OTTO Motors include Fortune 100 brands GE, Toyota, and Caterpillar. For more information visitwww.ottomotors.com. About the Job Having 10’s of robots run around our offices is great, but having hundreds of robots running around inside our computers is even better. Rich simulation environments offer a wide range of benefits to many aspects of our business: fast research, development and validation, sharp marketing tools and strong customer experience / support. We're looking for a Simulation Developer to create and run simulations that will help us optimize our robot fleets and system solutions. As a part of the Industrial Simulation Services (ISS) team, you will act as a subject matter expert and lead modeling and simulation activities. The ISS team works closely with our Systems Engineering, Applications Engineering and Project Management team, to support overall solution design from initial concept all the way to full system design and deployment. You will be building material flow strategies (based on self-driving vehicles) for products already in our arsenal and ones that do not yet exist. Your goal is to develop accurate and robust simulations to evaluate design, lower risk, and enhance the elegance of our solutions to fuel our growth. Primary Responsibilities Creating discrete event simulations for real and hypothetical systems, estimating fleet sizes, identifying traffic bottlenecks, testing what-if scenarios to optimize performance of robot fleets Consulting with project leads, sales team members and customers to obtain understanding of the requirements and to collect the necessary inputs Advising on simulation based metrics to evaluate system risks and performance Analyzing results and making recommendations for facility and material flow design Presenting your simulation results to our team of engineers, our sales team, and to clients Validating models against real world data to maintain accuracy relative to product portfolio Growing and improving our simulation library and internal templates for functionality, accuracy, scalability and efficiency Drafting functional specifications, proposals and effort estimation Recommending product feature and improvement ideas to our Product and Engineering teams, that lead to greater system optimization in the real world Additional tasks may include: Interacting with our development team as necessary to assess impact of new feature or product Developing simulation models to assist Sales & Marketing in demonstrating Clearpath's products and capabilities Using your expertise to assist our engineering services group in developing the more complex system concepts About You You're excited about the role that robots will play in the future, and intrigued by the challenge of joining a young company in this high-growth market. You have skills and experience that you know can make a difference with the Clearpath team, whether we're looking for them or not. You are driven and view work as more than just a job. You are motivated by making an impact on your workplace and you thrive on challenging and rewarding problems. Most of all, you want to be on the right side during the coming robot revolution. The ideal candidate will have: Proven success using simulation solutions to evaluate feasibility of facility design or operational changes Experience with discrete event simulation tools like Simio, AutoMod, AnyLogic, FlexSim, Delmia, and understanding of its limitations Experience collaborating with cross-functional and external client teams to gather comprehensive data required for model development and/or analysis Fearless in questioning to ensure end users get the most value out of your work. You understand the importance of early goal alignment and scope definition Effectively communicate complex model functionality to the client or internal team for assurance of model results accuracy Customer-first mindset Avid self-learner Ability to work independently with minimal supervision and manage deadlines. Able to cope with sudden jarring changes in projects, priorities, and the local gravity field. Bonus Points for: Experience identifying traffic and material flow bottlenecks and mitigating risk Experience in manufacturing industry Understanding of different industry warehouses. You see block diagrams and flowcharts everywhere and speak the language. Experience with Object-Oriented programming Working knowledge of one or more of C#, Python, VB.NET Exposure to working with ROS, Gazebo Past participation in simulation challenges What’s in it for you: Flexible Hours, Health Benefits, Parental Leave, Vacation, Equity, Community Days (paid), Half-Day Birthdays, Passionate and Dedicated Teams Curious to know more about the culture at Clearpath & OTTO, check out: https://clearpathrobotics.com/blog/category/blog/culture/ Come join us if you feel like our values resonate with you, and if you are interested in being a part of making industrial workplaces safer and revolutionizing automation. At Clearpath, we are committed to building and supporting a culture of diversity, inclusion, and accessibility. We hire the best talent regardless of race, color, creed, national origin, ancestry, disability, marital status, age, veteran status, six, sixual orientation, gender identity, and expression. If you require special accommodation to complete any portion of the application or interview process, please contact 1-800-301-3863.
  7. Hi Team, Good morning, I have a question that I need support. On my simulation under Planning tab then Entity workflow I see the Orders that I created, but also some other items that I don't know where those came from. that is using resources. for example, I highlight on the picture attached on red color. OrderWIP01 is waiting for the grinder [1] on the finish1_1, when I looked for it, I saw that is on Phx4.89. What is that Phx4.89? Phx4 is one of the names of the entities. but why does appear as entity and not as a Order? At the moment I looking for why to increase the output, as the simulation is giving me 17 unit per shift, but engineering said that it should be around 20. I want to make sure the simulation is done correctly. Thanks in advance. Regards, Htatton Arm-boom-draft-R1-test-092718-Test-Scheduled-3tacking.spfx
  8. Hi, currently my model has 2 manufacturing lines that are mirror to each other, depending on constraints by diameter, parts will go to a specific line. If parts are <60 inches they would go through line 1, but if parts are greater or less they can also go through line 2. My problem is I want to have Multiple Sequences on a entity and then be filter by diameter and line capacity. Any ideas?
  9. Hi everyone, I'm a freshman university student and am new to Simio, so please correct me if I make any beginner mistakes or say anything wrong. Also, I apologize for posting this in the general section - I didn't know where to post it. In my simulation, I am trying to use excelRead and excelWrite to input and output data to an excel file. I am also using labels to show the exact values. During the simulation, I would like to run a MATLAB script to modify the data in the excel sheet, and read it back into Simio. I have no trouble at all running a MATLAB function using the CallMATLAB step. The problem is reading the modified file back into Simio, which is not explained by the simbit or online tutorials, as far as I know. For example, the values initially in the spreadsheet were all 1's. The first time I use excelRead to read a file, Simio shows the data without a problem. After that, I change the values to 2's, but when excelRead process is triggered, Simio doesn't show changes. Note that the data in the excel file did change. Once I completely stop the simulation and run it again, Simio finally shows the new values. I apologize if I am completely incorrect, but I have been thinking of what the problem might be. It appears to me that the first time Simio uses excelRead to read a file, it somehow stores a copy of it and works only with it, and when it stops it somehow copies it back? I'm really confused about what's happenning. The point is that I just cannot read the same file more than once. Is it possible to modify and read an excel sheet several times while the simulation is running, or is it just not possible using excel files? If so, what would be some solutions to this issue? If I decide to use mySQL databases instead of excel files, would I face the same issue? Please note that I am not familiar with databases, and would like to use excel files if possible. Thank you all. Please let me know if my question is unclear or if you need any more information.
  10. Power BI & Simio Webinar - July 2020 Enhancing your Simio Results using Power BI MORE INFO AND REGISTRATION About the Webinar We're hosting this one to accommodate people in the central time zone as well as for people who missed the previous webinar Simulation modeling has many benefits, namely its ability to forecast and predict multiple scenarios. Simio does an incredible job of providing the user with incredible results, and Power BI enhances these results with useful insights and visualizations. This webinar will provide the benefits of using Power BI for Simio outputs, optimizing your analytics, and giving you a better understanding for decision-making purposes. What will be covered Overview of Power BI benefits with Simio Simulation models Real-world case study of a Simio project using Power BI dashboards Questions and answers for people attending the webinar More details Date: 09 July 2020 Time: 10:00 CAT (UTC +2) Duration: 45 minutes Location: Microsoft Teams (link on registration) Price: Free Hosts Jaco Botha Pr Eng, Managing Director, SE Marco Agas, Webinar Host, SET Presenters Nicolas Finn, Power BI / Simio Trainer, SET Hulda Viljoen, Simulation Engineer, SET
  11. I'm new to Simio. I'm trying to split my original entity into two different parts. The goal is to have the entity be separated, with half of them having a different server processing times through the same server.
  12. This model is for a simulation of waste haulage. The model has two types of trucks. One big and one small running to different speeds through the same path. Because of the size of the trucks (capacity), the big truck is going to have more delay time in the resource compared to the small one. This is cyclical process where the truck is loaded, then the truck transport the load and last the truck unload and return to the resource to be loaded again. In the model I am assuming that the entities are the loads. The entity requests any truck available coming after release the load. Then, any truck (big or small) take the load to the unloading area. Now, the time this entity is going to use the resource (loader) depends on the type of the truck, so this entity is going to take more time in the resource area in a big truck. how could I make this simulation in Simio? is it possible to have resources with different time depending on the entity? I was using other software with no success so far.
  13. Hello! I'm having problems with the WAIT process. I'm modelling trucks who brings pallets. This trucks must be heavy at the server "weighing". Later, It goes to a separate, where the truck goes to the sink1. And the separate create 3 copies of pallets entities. This pallets must be heave at the server "weighingPallets" and finally go to the sink2. My problem is that i just can have one truck with his pallets (3 pallets) after the server "weighing". After the truck and his pallets go to them sinks, the next truck can advance. I create several process. 2 to count the quantity (trucks and pallets), 1 to fire the event "WAIT" and 1 to wait until the condition "QuantityPallets > 0 && QuantityTruck > 0". Please someone help me with this. I don't know what else to do. wait.spfx
  14. Hi All, I've got a simulation that creates entities based on a data table - premiumCustomers and regularCustomers. I've got a tally defined PremCustWaitTillService that tallies: Run.TimeNow - ModelEntity.TimeCreated for premiumCustomers. If the premiumCustomer waits longer than 5 minutes, I want to be able to tally these events such that at the end of the simulation I can see x discounts have been awarded to premiumCustomers in the results stats in a tally stat called CountDiscountsGiven. I might have a couple of issues that I am confused on here. In particular: Using an entity's wait time as a conditional statement for assignment in Processes. When the premiumCustomer enters the server (processing), I tally PremCustWaitTillService with Value: Run.TimeNow - ModelEntity.TimeCreated. I imagine a conditional that states something like If PremCustWaitTillService > 5 I updated a tallystat CountDiscountsGiven + 1 but I can't seem to get it to work - I don't see any entities changing color (as I've set them to if they wait longer than 5). I've attached my file because my terminology may be off - the sim runs but no CountDiscountsGiven values show up. SpeedeeCarRentalNew.spfx
  15. I want to have a source that creates one entity of each part type everyday. The total number of different parts in the system can vary and the user must define a priori. That is, you can have 1 to N different types. Then I want a server that will use the info from a table that contain the process time info for each 1 to N types and the server will use this table to process the entity based on their corresponding process times. I want to do this by placing only one one entity type, one source, and one server. The table will be populated with as many rows (N) as needed a priori. Thanks
  16. Dear all, I do have a table called machineProperties which describes properties of machines: Machine | ProcessingTime | ... machine1 | 2 |... machine2 | 1.5 | ... In my model I would like to assign the property "Processing time" to machineProperties(DisplayName;"ProcessingTime"). I guess Lookup tables might be working, but unfortunately I do not know how to link them to an Excel file. Does anyone know how to do this? Thank you! Best regards, Stefan
  17. Hello SIMIO forum I'm new to SIMIO and I am working on a project for a industrial company creating masts for street lights So far I have setup the production as showed in the photo but i have one problem. Carl-C-layout.spfx
  18. My model assigns capacity of 8 to a server. Two types of Entities arrive...A and C. Before each entity is processed, I am assigning the server's process time using two different random distributions, one for A types and another for C types. My question is whether or not the processing times for any 8 entities in the server at a given time will process to different process times? Or, will the process time of the last entering entity reset the process time for the others that are already in the server?
  19. Hello, I have a data table with 900 total entities, comprised of 10 different types of entities. I am trying to randomize which entities go through the model, but I need all 900 to go through. I've tried the "entity mix" technique, but it always overloads my model with too many entities. Does anyone have an idea of how to go about this? I want to run a series of experiments with a random selection of entities for each replication. I hope this makes sense. Thanks in advance! -Mario
  20. Hi, I like to count total number of entities types waiting in front of the servers.Say for example, i am having entity1,entity2,entity3.Each entity is produced from separate sources(source1,source2,source3 respectively) .I got 5 servers(S1,S2,S3,S4,S5). Entity 1 processed in S1-S3-S5 Entity 2 processed in S1-S2-S4 Entity 3 processed in S3-S4-S5 Each entity has different arrival rate. i like to create a expression to sum the total number of entity type 1 waiting in queue infront of the servers S1-S3-S5.if total number of entity type 1 waiting is greater than 100 numbers,the next coming entity type 1 from the source1 should leave the whole system( i mean sink without processing)similarly i like to count for entity2,entity3. Can anyone help me out? Thanks, R
  21. Hello, The Average Waiting Times for all 3 entities don't look right. They are in the order of 0.0592 to 0.0854 minutes. Can someone help me? Thank you. Walter Assemply Line.spfx
  22. Hi Simio, Is it possible to model a block of raw material being turned into a part and swarf? I.e. a single part entity being split into two different part entities? Thanks Kevin
  23. Senior Industrial Engineer - Simulation Req #: 67308BR York, Pennsylvania, United States Engineering & Technology Platforms & Services Posted on:03/29/2021 Job Summary Career Level Experienced Travel Percentage 10% Full-Time / Part-Time Full-Time Clearance Level - Must Currently Possess None Shift 1st Shift Relocation Available Yes ITAR: U.S Citizen or Green Card Required Yes Clearance Level - Must Be Able to Obtain None Job Description What motivates you? If the answer is a position where you can develop your skills and earn opportunities for advancement while being part of a forward looking team then this is what awaits you in a career at BAE Systems. Our employees work on the world’s most advanced combat vehicle systems. From the M109A7 Mobile Howitzer with its long range firepower to the Amphibious Combat Vehicle that transports America’s Marines from ship to shore, we are developing the technology of tomorrow while delivering the most cutting-edge equipment available today. Our flexible work environment provides every opportunity to positively impact the company without giving up your personal life and we welcome all those who understand the importance of improving production velocity, having big ideas, and craving innovation. We draw strength from our diversity and always put our customers first through an unwavering commitment to bring the warfighter home safe. Does this sound like a team you want to be a part of? If so, come build your career with BAE Systems. The Combat Vehicles line of business within the Platforms & Services (P&S) Sector of BAE Systems is looking for a self-motivated Senior Industrial Engineer to support the production scheduling of armored military vehicles. Working as a team member of a larger Industrial Engineering Group, this Engineer will be required to build and maintain simulations for varied fabrication, assembly, and testing processes. The candidate must also be comfortable with soliciting input through face to face interaction and, in general, must demonstrate that they possess strong analytical, problem-solving, and interpersonal skills that will support individual and team growth. A strong background in discrete event simulation, specifically with the use of SIMIO, is necessary. Specific responsibilities include: Day-to-Day · Complete simulation support activities such as time studies, production line balancing and production metric development · Evaluate complex Technical Data Packages (Drawings, Bills of Material) and be able to understand how a component or vehicle is assembled · Utilize a strong understanding of integration activities like implementation of standard work, material kitting, metric tracking, and process improvement to advance manufacturing methods. · Work on the manufacturing floor with other Engineering disciplines, production supervisors, and employees that directly interact with the components or vehicles being produced. Internal and External Customer Relationships · Engage in regular communications with production support, planning, logistics, quality, manufacturing supervisors, and direct labor workforce to assess operations performance. · Summarize and present findings to internal customers to gain buy-in for improvement efforts · Discuss the status of metrics and key performance indicators with appropriate decision makers Development · Work with Industrial Engineering leadership to understand the expectations of new Engineer within the organization and company · Share responsibility of self-development with immediate supervisor · Maintain a safe work environment and ensure compliance with safety objectives and policies. Required Education, Experience, & Skills - 4+ years of simulation experience within SIMIO - BS degree from an accredited university Preferred Education, Experience, & Skills Demonstrated capability with the use and application of SIMIO discrete event simulation software. About BAE Systems Platforms & Services BAE Systems, Inc. is the U.S. subsidiary of BAE Systems plc, an international defense, aerospace and security company which delivers a full range of products and services for air, land and naval forces, as well as advanced electronics, security, information technology solutions and customer support services. Improving the future and protecting lives is an ambitious mission, but it’s what we do at BAE Systems. Working here means using your passion and ingenuity where it counts – defending national security with breakthrough technology, superior products, and intelligence solutions. As you develop the latest technology and defend national security, you will continually hone your skills on a team—making a big impact on a global scale. At BAE Systems, you’ll find a rewarding career that truly makes a difference. The Platforms & Services (P&S) sector under BAE Systems, Inc does the big stuff: the armored combat vehicles, naval guns, missile launchers, and naval ship repair…just to name a few. Our employees take pride in the work they do and why they do it. They are on the front lines every day, building our products to protect the lives of those who serve. We may be biased, but we think P&S does some of the coolest work around, and we think you will too. At BAE Systems, we celebrate the array of skills, experiences, and perspectives our employees bring to the table. For us, differences are a source of strength. We’re laser-focused on high performance, and we work hard every day to nurture an inclusive culture where all employees can innovate and thrive. Here, you will not only build your career, but you will also enjoy work-life balance, uncover new experiences, and collaborate with passionate colleagues. https://jobs.baesystems.com/global/en/job/67308BR/Senior-Industrial-Engineer-Simulation Thanks, Jenny Ridings, PHR Principal Talent Acquisition Specialist BAE Systems My pronouns are she / her M: +1 904 570 2489 | E: jenny.ridings@baesystems.com https://jobs.baesystems.com Connect with BAE Systems: Join our talent community!
  24. Hello, I am modeling a container terminal. I have different servers which model my container storage yard. I have two different Model Entities, "ImportContainers" and "ExportContainers". I created an Add-On Process on Entering the OutputNode of the storage servers. In this process, the destination node is defined ("SetNode"-step) based on the type of Entity and a transporter ride is initiated ("Ride"-step). It works. Now I want to change the destination to a group of servers (which represent a group of truck loading stations). So I grouped the InputNodes of these servers into a NodeList. But in the Add-On Process I can't set the NodeList as a Destination in the "SetNode"-Step. I need this, because I want to set different NodeList's as a destination for my "ImportContainers" and "ExportContainers" respectively. My questions are: 1. How can I set a NodeList as a destination in an Add-On Process? 2. When using NodeList's as destination, how can I be sure that only servers are choosen randomly from that list which are not full? Thanks!
  25. I was inspired by the VehicleX3 (vehicle with operator) that was shared on this forum. I would like to use this type of VehicleX3 with an operator who is a worker to simulate a process where the operator is required to take breaks after certain periods of activity. To implement this logic, I think it would be helpful to have Reliability Logic for the worker object in Simio. This doesn't seem to be part of the standard library so I tried to create my own subclass version of Worker with the Reliability Logic "copied" from the Resource object. My attempt to implement this custom object seems to work as long as the custom worker object doesn't "move". If the custom worker object moves, I get the Runtime error "Possible infinite loop detected in process logic". Any assistance in getting the logic working properly, or pointing me to an existing custom worker object that has Reliability Logic incorporated would be greatly appreciated. I'm attaching my small example model to illustrate the error when the worker (P1) is required to move to the Dest1 server as a required secondary resource for processing. WorkerWithFailuresExample.spfx
×
×
  • Create New...