Jump to content

Search the Community

Showing results for 'entity AND destination AND label'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Simio Public Forums
    • Welcome and How To Become a Simio Insider
    • Simio News and Announcements
    • Simio Product Details
    • Simio-Related Positions Desired or Positions Available
    • Help Getting Started with Simio
  • Forums for Simio Insiders Only (See Public Forums Welcome topic to sign up)
    • SI General Discussions
    • SI Sprint Releases
    • SI Shared Items
    • SI Ideas and Suggestions
    • SI Known Issues and Workarounds
    • SI Performance Tips
    • SI Non-US Cultures
    • SI Student Competition
    • SI Educational
    • SI Libraries and Objects
    • SI Animation and Visualization
    • SI Distributions, Functions, and Expressions
    • SI Simio Tabs
    • SI Experimentation and Optimization
    • SI Functional Approaches
    • SI Industries / Domains
    • SI Types of Simulation
    • SI Emulation
    • SI API

Categories

  • Files
    • Academic Information
    • Product Information
    • Case Studies

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About Me


First Name


Last Name


Company/University Name


OCCUPATION


ICQ


WEBSITE


YAHOO


AOL


LOCATION


FACEBOOK


GOOGLEPLUS


SKYPE


TWITTER


YOUTUBE

  1. Hi everybody! I want to know if it is possible that an entity can change from one server to another if the another server is available and the entity isn't still processing. It means if it is possible that an entity can exit from the input buffer of the first server. Thanks for your help. Best, Albert.
  2. Hello everyone, I am a master's student in operations management trying my hand at Simio for the first time. I want to develop a model that simulates the delays incurred by variable supply lead times which may lead to stock-outs at a manufacturing plant. I would like to model demand so that each entity generated by a single source module corresponds to a sales order. Each order should have a probability to include orders for several specific product types (since sales orders may contain orders for different product types). As such, entities should have an arrival rate which corresponds to the arrival rate of orders at the company, and the product mix of each order should reference the probability of a given product type being included in that order (i.e. product A has 25% probability to be included, product B has 50%, etc.). Is it possible to do this? I would also like for each product type to be associated with a specific BOM. I.e., a server module should reference each entity instance to consume material as defined by the BOM’s of the products stated by the entity instance. I have defined each component as material elements and defined a BOM for each finished product that references the materials needed. However, in the server module I am only able to input a specific type of finished product as material requirements... Your help is greatly appreciated!
  3. Let's say I want exactly 100 entities arrive where the arrival of each one follows a normal distribution with mean 1 hour and standard deviation of 5 minutes from the start of the simulation. How can I model that within SIMIO? The interarrival time doesn't make sense because I don't know / care what the interrarrival time between each entity is. I realize that I could randomly generate 100 normal random variables outside of SIMIO and input them all as an appointment, but I am wondering if there is a better way especially if I want to do many replications with a different set of 100 random variables each time.
  4. I have an entity type. 50% of that entity is one counter type while the other 50% is two counter type. After the entity exits the server, 50% must exit while the other 50% must go to the second counter. How do i do this thanks
  5. Hi, Have an issue relating to trying to track a segmented entity with the camera. I've attached a very simple model that demonstrates the problem. As soon as i set the draw type to 'Segemented' the camera tracking just doesn't work. One possible solution i am aware of is to simulate the segmented object as individual entities. In the context of what i'm trying to do this creates a lot of additional complexity that i don't want to address. Any other bright ideas? Thanks, Lucas Camera Tracking Segmented Entity.spfx
  6. I just want to make a label that outputs a list string, given a list state number. Similar to the Busy, Transporting, Failed list state types objects have. E.G. Have a label over a vehicle, that says "Transporting" while it is moving, "Failed" when it has failed... etc. The only way I can see how to do it, would be to make my own table, and do a search in it using the resource state number. Will post back if I find it before someone else posts.
  7. Hi, A combiner is able to combine 1 or more entities into a parent entity. The number of entities that are batched together is specified in the property Batch Quantity. I recommend looking at the SimBit "Combine Multiple Entity Types Onto Pallets" for an example. Best, Khaled
  8. Hey Simio insiders, I have been working on a model with workers. The workers transport goods over a facility, from one server to another. They seem to work perfectly until about 2 hours into the simulation. I have been looking into the the 'watch' properties, and it appears that the worker is waiting for something. This happens eventough i do not have a wait process in place. It waits at a server which it is about to drop an entity. The server input buffer is infinity, since i thought it might have caused the problem. Do any of you know why my worker is waiting?
  9. Hello Javiera, Based on how the model is set up, Guardian_1 and Guardian_2 follow Work Schedules with specific Day Patterns. Looking through the Trace lines, it appears that Pedido_PU.597 arrives and seizes Guardian_1 which, not much longer after it was seized, was scheduled to go off shift based on Work Schedules. The current Off Shift Rule is 'Suspend Processing' which causes the entity being processed to be suspended until the exact Resource is back on shift. To allow the entity to choose an alternative on shift resource, the Off Shift Rule property can be changed it to 'Switch Resources if Possible'. Best Regards, Khaled
  10. Sorry if this is obvious, but can someone tell me how I can reference the number of batchMembers in the example above without having to reference the specific entity, which in this case is TruckLoad.5442. I need something like "the number of batchMembers in the entity currently in the ParentInputBuffer" please. e.g. TruckBay1Batch.ParentInputBuffer.Content.???.BatchMembersCount? As you'd expect, this number changes constantly during the simulation run. At this moment of simulated time, the answer is 2. Thanks for your help!
  11. hello i'm the simio user in south korea i want to make my model flexibily. My model has vehicle and elevator The overall process flow is vehicle take entities to server1, After vehicle arrived to server1, elevator take entities and go to every destination. To work well, Three things are needed for this trend First, i want to do if the vehicle comes to server1 then the elevator goes to upstair Second, the vehecle has to wait until the elevator after been to upstair and arrive to server1 Third, repeat the two steps. how can i solve the problem this model in Model2, not Model1 1veh1eleModel.spfx
  12. Please excuse a naive question from a newbie. Building a simulation for material flows in selective mining. Entities, "low_grade" and "high_grade", supplied at different rates by two sources, both go into a server (the mining machine) which passes them to a separator. I want the high_grade entity to go to a processing subsystem, and the low_grade entity to go to backfill (or a waste dump). Do I presume correctly that I should use a Separator for this? If so, how do I set it up to send the two entity types to different destinations ? At present, all seem to be going to the same destination. Instead of having different entities, could I use one entity type and assign grade values according to a probability distribution? If so, how would I then use a separator to send below-cutoff material to backfill?
  13. I'm making a simple simulation model of a hospital and I'm having trouble with the routing of my model. For instance, a patient first goes through ED and then to OR. if there is no room in the OR, then the patient must stay in ED. How can I model this? I don't want the patient to wait at any input or output buffer, because then it assumes that the ED bed that the patient used to stay in is now free but it actually isn't. Each bed is modeled as a server and there are more ED beds than there are OR beds. Naturally, all ED beds connect to a single transfer node, which then connect to all OR beds.
  14. Hi, In my project, I have the (main) model of object type 'fixed' and a model of object type 'server'. In one of the processes executed by the model 'server', I want to add a search step that searches a specific entity in the entity population of the main model. How can I do this? Thanks in advance! Kind regards, Christa
  15. Hi, I am trying to demonstrate a manufacturing process flow, by doing so I want to show a visual progression of the entity through the entirety of the simulation. Setting Random Symbol on to 'True' is not what I am looking for. I have 10 entity symbols and they have to change specifically between servers. How is that possible? Thanks,
  16. Hi, I would like to return information from an entity in a queue (parent input buffer) at a specific index. If I use the search step with following property values (see attached image) I receive an error (see attached image). What does this error exactly mean and how can I solve this problem? Thanks in advance! Christa
  17. Is there a way to label an entity with an ID (customer vechile ID) as it moves around the different maintenance shop? The ID is coming from an excel file. Thanks
  18. Hi, Is it possible to set the state variable of the parent entity in a batch equal to the sum of state variables of all member entities in the batch? Context of the case; a truck (parent) is loaded with x number of orders (members). These orders have a specific value for the state variable 'NumberOfRollContainers'. The truck has the state variable 'TotalRollContainers', which should equal the sum of the 'NumberOfRollContainers' in that batch. Kind regards, Christa
  19. Is it fair to say that the longest waiting time in the parent queue is the first entity at the queue? If so, you could use something like: Candidate.Node.AssociatedObject.Combiner.ParentInputBuffer.Contents.TimeWaiting(Candidate.Node.AssociatedObject.Combiner.ParentInputBuffer.Contents.FirstItem) to access the combiner which has the largest value of the time waiting of the firstItem in the queue. It seems to work
  20. Hi, I am looking for an event which can be used in a Wait step in a process which is triggered by an entity finishing processing in a station. Also potentially an event which is triggered when an entity exits a station. Do I have to manually fire an event with an addon process from every station which I wish to do this?
  21. Hello, We want to assign the entities to different servers. The first server has FIFO selection system, and the second has FIFO with entity type OTC as the first priority, and the third server has FIFO. Furthermore, the servers open and close sometimes, but the entities keep transfering to the closed server. How can we divide them after the described rules? We have tried to get the output node to select from a list of nodes with the input of the different servers, but then the entities always choose server1. OTC-and-prescription-model.spfx
  22. Hello All, I am new to Simio and trying out a simulation of an aircraft component assembly shop. I am using Sequence table for my jobs routing and processing scenarios which is - Source -> Set A (4 servers) -> Set B (7 servers) -> Set C (5 servers) -> Set D (2 servers) -> Sink Here each Set denotes similar workbenches to any of which a job can be routed based on utilization and availability at that point of time. So for routing job based on above criteria from Source, I created sequence table with 'Node list property' (which is list of input nodes on 4 servers of Set A) instead of 'SequenceDestination Property' as required by Sequence table. I want to replicate the sequencing from Source -> Set A -> Set B and so on. But want simio to pick the server of these sets based on my criterion. Unfortunately it is not working as I assume Sequence table need to have specific node as SequenceDestination. I am not sure if I am doing it right or what is correct and way to do it. I will highly appreciate any suggestions to make this happen in Simio. Thank you. -Mohmed
  23. Thank you very much for your help, but simio says I can't use the Release step with the server because I don't have any resources to release. In addition, although the Search step works very well, since I don't have any step that keeps the entities inside the server even if they are not called, they continue to leave the server and merge with entities that should not be merged. If I set the processing time to infinity, despite calling entities with the Search process, the entity does not leave the server. I tried to condition the processing time of each entity according to the "Ventana_de_entrega" state, but as expected, it is not the most appropriate. 21.10.spfx
  24. I have entity1 and entity2 entering a server. I want entity1 to have priority over entity2 when in the input buffer waiting to be processed no matter how many entities are already in the input buffer. I'm using connectors leading the entities into the server input node. Any suggestions?
  25. Hi There, I have lots of experience in simulation but I'm new to Simio - my apologies if my Simio vocabulary/conceptualization is off or if this question has been asked already. I'm working to build a queue model simulation with a network of services and multiple staff types. In my mind, it makes the best sense to do this using the standard library of servers and resource pools (to visualize the network for stakeholders and be able to model multiple staff with different schedules that can each respond to multiple services). Right now, I am starting with a single stage M/M/c type queue to make sure that my implementation is correct before scaling this upwards. I checked out the SimBit titled 'Source – Server – Sink' that has three different M/M/c implementations; however, none of them use Resource Pool objects or combine process triggers with the standard library. I was able to implement a basic model that tries to combine a resource pool with a server by triggering separate Seize and Release process triggers on entry to the server object and after the processing time is completed, respectively. It runs without error; however, the results for average time in system (calculated by an average of a tally statistic that is only recorded for every 500th customer/entity), the results are one third less than in a scenario where I don't use a resource pool and set the capacity of the server explicitly, (which I validated against M/M/c formulae results). Does anyone have tips for how to link servers and resource pools and troubleshoot this scenario? Is there a SimBit or other example out there that is relevant? Am I triggering the seize/resource processes at the wrong points in time? Or is my framework for how to conceptualize this in the Simio environment missing a key concept? Thanks!!
×
×
  • Create New...