Hello, I have selected Suspend Processing in the Off Shift Rule portion of my server modules but when I use a Status Label to indicate the Resource.Capacity.Utilized / Resource.Capacity, it appears as though the resources are not going off shift until after processing the entity in the server calling on the secondary resource. What else do I need to do? I'd like for the Resource to go off shift (and not finish the process) according to the Work Schedule assigned to it and then pick back up the processing of the entity when it gets back on shift. I've looked into several other posts but they seem to be outdated. Thanks!
-
Hello, this is probably a trivial question but I've already read a lot of material and tried a lot of things but I've been unable to do what I need. I have a Top Model which represents the general view of my facility, and a submodel consisting of a Workstation and some additional logic of combiners and separators. This submodel represents a machine that I want to instantiate in my Top Model multiple times. Now, I'll need to assign an operator present in the Top Model to perform the setup and teardown steps in my Workstation. And so, I've tried to reference the Secondary Resources, so I can assign the operators in the top model. But referencing the secondary resources it does not seem to work since the top model does not get access to the subfields in the Secondary Resources (Object type, Object Name etc.). I've also tried to individually reference each subfield but this also does not seem to work, since the referenced subfields do not seem to be part of the Secondary Resources Repeat Group. Which is the cleanest way to achieve want I want? Thank you in advance, Pedro Prates
- 3 replies
-
- workstation
- secondary resources
- (and 3 more)