Search the Community
Showing results for tags 'secondary resources'.
-
Hello, I have selected Suspend Processing in the Off Shift Rule portion of my server modules but when I use a Status Label to indicate the Resource.Capacity.Utilized / Resource.Capacity, it appears as though the resources are not going off shift until after processing the entity in the server calling on the secondary resource. What else do I need to do? I'd like for the Resource to go off shift (and not finish the process) according to the Work Schedule assigned to it and then pick back up the processing of the entity when it gets back on shift. I've looked into several other posts but th
- 2 replies
-
- work schedule
- rule
-
(and 3 more)
Tagged with:
-
Hello, this is probably a trivial question but I've already read a lot of material and tried a lot of things but I've been unable to do what I need. I have a Top Model which represents the general view of my facility, and a submodel consisting of a Workstation and some additional logic of combiners and separators. This submodel represents a machine that I want to instantiate in my Top Model multiple times. Now, I'll need to assign an operator present in the Top Model to perform the setup and teardown steps in my Workstation. And so, I've tried to reference the Secondary Resources, so
- 3 replies
-
- submodel
- referenced property
- (and 3 more)