Search the Community
Showing results for 'maintenance plan'.
-
I am trying to simulate a model of a factory where 6 hours of planned maintenance occurs every Wednesday at the same time, from 8am to 2pm on the production line. There is a second almost duplicate line which can then be operated when the maintenance begins, it is attached to the 1st line after the source and the first server. The factory is 24/7 in production. When this occurs the 1st line should clear of all entities and should remain empty for the 6 hours. How is it possible to simulate this 6 hours of no production on the first line after the first server and when this happens the source should continue producing but follow another path to a second line after the first server. From this experiment i want to see how many entities can still be created over a period of time when the maintenance occurs by using the second line.
-
I'm trying to model a machine with two sensors, one measures pressure and the other measures vibration. the machine failure rate depends on those values that we need to monitor. lets say that both measures are function of time. X(t)= Pressure Y(t)= Temp. the failure rate will be a function of x and y and we want to trigger the maintenance if the conditional failure probability exceeds the threshold. any idea or hints on how to model this in simio? ~Ali