Jump to content

Search the Community

Showing results for 'buffer transfer node'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Simio Public Forums
    • Welcome and How To Become a Simio Insider
    • Simio News and Announcements
    • Simio Product Details
    • Simio-Related Positions Desired or Positions Available
    • Help Getting Started with Simio
  • Forums for Simio Insiders Only (See Public Forums Welcome topic to sign up)
    • SI General Discussions
    • SI Sprint Releases
    • SI Shared Items
    • SI Ideas and Suggestions
    • SI Known Issues and Workarounds
    • SI Performance Tips
    • SI Non-US Cultures
    • SI Student Competition
    • SI Educational
    • SI Libraries and Objects
    • SI Animation and Visualization
    • SI Distributions, Functions, and Expressions
    • SI Simio Tabs
    • SI Experimentation and Optimization
    • SI Functional Approaches
    • SI Industries / Domains
    • SI Types of Simulation
    • SI Emulation
    • SI API

Categories

  • Files
    • Academic Information
    • Product Information
    • Case Studies

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About Me


First Name


Last Name


Company/University Name


OCCUPATION


ICQ


WEBSITE


YAHOO


AOL


LOCATION


FACEBOOK


GOOGLEPLUS


SKYPE


TWITTER


YOUTUBE

  1. Hi All,

    I have defined the input buffer capacity and output buffer capacity for my servers, If the input buffer of destination server is full the vehicle still picks the entity(from output buffer of previous server) and moves to the destination(next) server and just waits with the entity unless input buffer capacity is available , how can I restrict the forklift from not picking up the entity or should only pick when the next server/destination has input buffer capacity available. any thoughts on this would be helpful.

  2. FullGate version 17 (both side take off).spfx We encounter few problems: 1. Why the plane( entities) only go to one side for waiting to take off but not both side used? 2. Any fomular can i add into the simio? The plane will choose which path to go on the taxiway. Such as the plane on the Node 82 if the taxiway A(path 179) had 3 plane waiting but taxiway B (Path 160) had 1 plane waiting, than the plane will choose taxiway B to wait for take off. Gate.xlsx 30 Departure.xlsx
  3. Thank you Dave! Inspired by your approach, I defined two Node Reference State Variables for the Entity: EndDestination and NextNode. In the model Processes, I first determine the Entity State Variable EndDestination based on a DataTable with probabilities per destination node. Then, at routing decision points, I have created processes that evaluate the EndDestination node and set the next node for the unity based on that. Although it requires a bit of 'hard modeling', it works like a charm! Thanks
  4. I have attached a simple model using model states to illustrate. I think it should work in a similar fashion using entity states. First, I define the states: Then use those states as Sequence destinations: Until you provide each of those states a value, the Sequence will make no sense and the entity won't know where to go. So on the Source I use an Assign to initialize all the values. This will direct the entity sequentially through Servers 1-4, and then to the Sink: Finally, just to illustrate the technique, on the output node of Server3, I interrupt the normal sequence by Assigning it to instead go to Server5 as its 4th step: If you convert these states to Entity states instead (I was just lazy), I think it should work the same but allow you to selectively override any Sequence Step at any time. UsingStatesInSequences.spfx
  5. Hi David, I am trying to get your option 3 to work in my model, as the solutions sounds brilliant. I created an Add-On Process that probabilistically assigns destinations to the Entity and by assigning the destination node to the Entity's State Variable MyDest. In the Routing Logic, I've set the Initial Sequence to the sequence table called Routes that holds all possible routes. However, the entities now only follow the first sequence Routes (Input@LoadingDock9, Input@Sink_HTB), whereas Entities with the destination Input@Sink_RTM should follow the sequence Input@LoadingDock10, Input@Sink_RTM. How can I let the Entity follow a specific sequence from my Sequence Table Routes?
  6. Hi I need reference to some sort of property that can help me store entities in my transfer node(shelf). I have used the Park property but then I am not sure on how I can release it when the transporter is told to arrive at the transfer node(shelf) to pick up certain of those parked entities. Any help is appreciated. Thank you
  7. Hi all, in my model I have a specific transfer node where a worker transfers an entity to a vehicle. I cant add the load unloading times in the worker or vehicle due to the fact that there is only loading time in this transfer point exactly. I was wondering if there is a way to directly add a "processing time" to this transfer point. Maybe by creating a subclass? Thanks
  8. I'm having some trouble with worker actions and transfer steps. Below is a picture of my current model. I have also attached the simio file itself. What I want to happen: Worker1 carries both entities to their respective nodes and leaves them in their respective stations after worker(A/B) "checks them" (I used a delay to simulate this check) and then Worker1 moves on. The worker(A/B) only picks up the entity if needed. So if the worker was with another entity in process (like Srv(A/B)), he would go check the new entity so that worker1 can move on, but would return to finish out the first entity to the end. My problem: Worker1 doesn't wait for the other workers to check and move on, just puts in station and moves on. I can suspend and resume the processes and get the worker to the (A/B)PICK nodes, but the worker picks the new entity up and starts that. The entity they were working on before just vanishes or something. Then everything becomes a standstill. Lastly, I run into this transfer error so much, and can never figure out exactly what causes it. ModelForQuestionCOPY2.spfx
  9. Thank you for responding - in that configuration, does that mean I need 100 excel sheets? Right now, I have 100 rows that have the different experiments I want to run, and all the values needed for the node-lists / transporter-lists and entities to be used Thanks for your help!
  10. To make an entity wait until the runway is free what you could do is set the Initial Traveler Capacity of the Runway path to 1. This way entities will wait at the node before entering the path. I did not understand the first question, but if you need entities to visually appear behind one another, set Allow Passing to False on the path. Alternatively, you could use conveyor instead of path to make entities allign and respect some distance. Hope it helps.
  11. Hello, Server (reflecting the storage/kitting area) in my push model is connected to multiple servers. I have below conditions to fulfill while routing entities from an output node of this server - After every 5 minutes, 1. Scan through the sequenced entities at kitting area (output buffer) 2. Scan through the output destinations to check if they have space available for transfer. 3. Route all the possible parts in sequence from the origin server. Can someone help with advice or any reference model to replicate this scenario in Simio. Thanks in advance. -Mohmed
  12. Hello, I'm college student preparing the contest sponsored by "KOREA SOCIETY FOR SIMULATION". So I'm making model which has no input buffer , just remaining on the path. But the issue is that, if i set the input buffer as 0, the source makes entities only two, which is the sum of the sever's capacity.... I have seen that kind of model at the jsmith.co , but my model doesn't act like that.. What should I do for my model? isThereInputBufferCapa.spfx
  13. Hello Gosia, I recommend using two State Variables to record the start and end times using the function TimeNow upon the Vehicle’s arrival to a Node. A Decide step is needed to check if the Current Node is different from the Destination Node and that is when values of the State Variables are assigned using the Assign step. The Processes will be set at the Vehicle’s Add-On Process Triggers On Entered Node and On Exiting Node. You can visit the SimBit section under the Support ribbon and check the SimBit titled “Record Distance Traveled” to see a similar example. Another approach is to create a custom Vehicle Class and use a Level State Variable instead of the two Real State Variables to collect information of the travel time. I suggest exploring the Level State Variable in the Help pages under the chapter titled “States”. I recommend checking the SimBit titled “Using Level States (from project Infection Propagation Using Continuous And Flow)” as well. Best Regards, Khaled
  14. Hello, Worker has a state variable to set ride capacity on run time (Worker.RideStation.Capacity). What you could do is save the number created on a modelentity variable, and set up a addon process trigger on Entered of the node MemberOuput@Separator to first verify if it is a worker (Decide Step with Is.Worker), and if true, you would use a Search step to search through QueueState -> Separator1.MemberOutputBuffer.Contents and assign the Worker.RideStation.Capacity to the value of the modelentity variable found.
  15. I used to have a similar problem. My advice, avoid the pallet entering the combiner untill you have defined de @new@ batch size, elseway the batchsize wont be updated. In my case I put a scan step in a prevoious node, retaining the pallet ouside the combiner until I've re-defined the batchsize. Let me know if that works Rds
  16. Hi I have draw a Conveyor and conntected it to a InputNode of Server. Now I have to change the model and connect the Conveyor to another BasicNode. How can I do this without removing and redrawing the conveyor?
  17. Hey Simio insiders, I have been working on a model with workers. The workers transport goods over a facility, from one server to another. They seem to work perfectly until about 2 hours into the simulation. I have been looking into the the 'watch' properties, and it appears that the worker is waiting for something. This happens eventough i do not have a wait process in place. It waits at a server which it is about to drop an entity. The server input buffer is infinity, since i thought it might have caused the problem. Do any of you know why my worker is waiting?
  18. I have entity1 and entity2 entering a server. I want entity1 to have priority over entity2 when in the input buffer waiting to be processed no matter how many entities are already in the input buffer. I'm using connectors leading the entities into the server input node. Any suggestions?
  19. I think your worker has entered the node but it is not a visit, so that it waits until any other object seizes it. Have you transfered your worker onto that node by using a SIZE or MOVE step?
  20. How can I model where the robot always pick 2 parts and waits until 2 parts are available at output buffer of the server. (Robot is available in extras library). i have multiple servers in the model.
  21. Hey, I've got a quick question on how to route to a combiner with the longest waiting time in their parent queue. I think it should be quite easy, but i cant seem to make it work. What i have been doing is setting the selection goal of my routing node to largest value, and select from a list. This largest value I think should be the the longest waiting time in the contents of the parentinput queue. I have tried this multiple ways both using assosiated object and without. When i recall the number waiting it seems to work, but with recalling the waiting time i'm doing something wrong. My current expression is: Candidate.Node.AssociatedObject.Combiner.ParentInputBuffer.Contents.TimeWaiting(ModelEntity) or Candidate.Combiner.ParentInputBuffer.Contents.TimeWaiting( object ) both seem to work for content.numberwaiting. I think i am describing the ( object ) part wrong but cant find how i should write for the modelentity otherwise. I have tried to recall a specific entititype like so --> TimeWaiting(Truck) this also does not work. Does somebody know how i can acces the ParentInputBuffer.Contents.TimeWaiting? Greeting Piet
  22. Is it fair to say that the longest waiting time in the parent queue is the first entity at the queue? If so, you could use something like: Candidate.Node.AssociatedObject.Combiner.ParentInputBuffer.Contents.TimeWaiting(Candidate.Node.AssociatedObject.Combiner.ParentInputBuffer.Contents.FirstItem) to access the combiner which has the largest value of the time waiting of the firstItem in the queue. It seems to work
  23. How do you use the transfer step to bring an entity from a path to another node. Currently at the reached end condition of the path I created a Transfer Step process that moves it to another node. I keep getting the error "The entity's current location '[EndOfLink] Path3' is invalid for attempting the specified transfer request". When I set From to EndOfLink I cannot fill any 'To' options. What do I do?
  24. Hi! can you help me please? In my model I have a server that I want to function as storage, this server is linked to a combiner which will combine the member entities that leave the server with a parent entity that will arrive at it from another node. Each member entity has a state with a unique number linking it to a parent entity (there may be more than one member entity with the same state number). How can I extract from the server only the member entities whose state is equal to the state of the parent entity that arrives at the parentinput of the combiner? Thank you so much! 18.10.spfx
  25. Hello All, I am new to Simio and trying out a simulation of an aircraft component assembly shop. I am using Sequence table for my jobs routing and processing scenarios which is - Source -> Set A (4 servers) -> Set B (7 servers) -> Set C (5 servers) -> Set D (2 servers) -> Sink Here each Set denotes similar workbenches to any of which a job can be routed based on utilization and availability at that point of time. So for routing job based on above criteria from Source, I created sequence table with 'Node list property' (which is list of input nodes on 4 servers of Set A) instead of 'SequenceDestination Property' as required by Sequence table. I want to replicate the sequencing from Source -> Set A -> Set B and so on. But want simio to pick the server of these sets based on my criterion. Unfortunately it is not working as I assume Sequence table need to have specific node as SequenceDestination. I am not sure if I am doing it right or what is correct and way to do it. I will highly appreciate any suggestions to make this happen in Simio. Thank you. -Mohmed
×
×