  1. Dear Forum,


    I am trying to build reality into my model. I have 3 shifts (1st, 2nd, 3rd). 1st Shift works form 7AM-3PM, 2nd Shift works from 3PM to 11PM, then 3rd shift works from 11PM to 7AM of the following day. So, I tried to put in Day Patterns in my schedules and on my 3rd shift, it resulted in an error "Duration must not result in a Work Period that spans multiple days."


    Is there a way to model these 3 shifts as they actually exist in the factory or do I need to change the time frames to "dummy" time frames so that do not span over a 24 hour period?


    Thanks,

    Bill