  1. Hi, I created a new simulation and I need a warm up time for my factory. My factory starts to work as it is after 1 hour and I want to make all the statistics 0 at that time to start taking statistics correctly. In all the simulation tools we can make some time as warm up so that the simulation wont take into consideration that time into account while it is calculating the statistics. How can i do that ? Thanks
  2. Hi Everyone, I am having another trouble right now. It is about a combiner. I have a line which I have to combine 3 parts. One is parent but the other 2 must be member. It is the normal procedure. But the tricky part starts. Since one of my line is really slow the other must wait for the other part to come. But it is just taking the which two comes first. I tried to make it with matching rule but I couldn't find a way. The way I tried was if I can make the priorities of the coming entities like 1-2-1-2 for the first entity and for the secound again 1-2-1-2 then I can say to the matching
  3. Does someone know how to create a changeover matrix property?
  4. newworkstation.spfx Hi everyone, I am trying to change my workstation so that I can add as many processes as I want to the secondary resources section also so that while my machine is for example extruding a part and if I require a worker at the extruding part only ( not setup, processing etc. ) I want to choose it from there so the object will know when to call a worker. I am attaching my first try but also here I could'nt make it work with the times too. And I made almost everything same with processing part so it must work . I am attaching it so that maybe you can tell me what is my p
  5. How can I use this library? I created a project and I want to use a crane. But do I have to look to the example and built my own crane or somehow can I copy this crane from this project to my project? Thanks
  6. Hi, I am creating a new model while I was creating my processes I realized that I need to give Process Times within the processes. I used an assign module but I couldn't assigned process time to an object... Is there anyway to give process times from processes window? Thanks
  7. Hi, As I mentioned at the last question I tried make a model in order to make the rps. I need to create a model according to the RPS example that is in the Simio itself. But there is only 1 problem and we know where our products will go to. But what if I have 2 different cuts in the rps example and also what if I have 2 different weld stations in the example an our product can go which ever it want then it has to move to its own way. How can I create a table saying that My order can go to both cuts but if it goes to cut one then it must have this direction and saying that which statio
  8. I want to create a sequence table with multiple options in it. For example I want to send an item with respect to a sequence but while I am making it there is a job where can be done in 3 different places so I want it to choose which is empty and go there ? Do I have any possibility to make it with a sequence table? Since I must put it in a sequence table while making the Rps example? In the RPS example I was sending them just 1 places but imagine there are 3 cut stations... Thanks
  9. By the way the reason that I can not do it is also I can not find any option like Accepts Any Node. Thanks
  10. Hi I am trying to make the RPS example of Simio which came with the programme. But in the example there is a column which has a name of sequence and property of SequenceDestination property. I could not find that property and in order me to continue with the example I need to learn what is SequenceDestination property and how can I manage to create a column with this property. Thanks for the help
  11. Hi, After I finished the scheduling for my vehicle ( you said that I can use dwell time and worked perfectly thanks for that again! ) I created a chart so that I can see when my vehicle is transporting and when it is waiting. But then I realised that my vehicle seems to be working all the time. Do you have any suggestions how to do this? Thanks
  12. Thank you for your replies they were really useful. Especially the 3rd option was the best for my problem.
  13. I made what you said before but I could not assign the values in the table. For example I created a table which is like this 01:00:00 02:00:00 03:00:00 04:00:00 etc. I assigned the table with right click to Dwell time and it gives me an error. Do you have any kind of examples so that I can see how to assign a table or which type? Thank you
  14. Ok I did it wrongly I presume. Thanks for the reply...
  15. Hi again.. I have a different kind of a problem today. For example lets think that I am making a simulation about ferries. I have just 2 seaports to use and 2 ferries to use also. My ferry is taking possibly 40 cars per travel. And I want to control the ships to start traveling according to a table that I will create. For example the ferry must stop at the port at 9:45 until 10:00 and start traveling at 10:00. It takes again beetween 35 to 45 minutes for it to cross the sea and when it reaches to the port it must wait until its time will come for example 11:00 so that it can move again t
  16. Thank You for your answer. But it still doesn't work when the time between the stations are long and the interarrival times are smaller. For example let me put the problem for you like this: These are my activity points. A----B---C-----D----E I am producing a car seat. Where I have the source at point A. The interarrival times must be 2 minutes for a car seat and I have 4 kinds of different seats. The timepath between A and B takes 1 minutes to reach to the point B where I am first combining 10 seats in a pallet. Then from the point B to C I am moving the pallet wi
  17. Hi, I want to find the lead times of a system, but I couldn't find how can I find lead time.In the codings we can find the whole time in system for a part but for example if I have a line like below from A to B and I want to find out the lead times of the products one by one between C and D. Since I couldn't find how to write every single data on a table I can't find out the lead time between C & D. A-----------------C-----------------------------D------------B
×
×