Changing Server Capacity Over Time with a Work Schedule

In this video tutorial, Simio CEO Dennis Pegden builds a simple model to have a server run a schedule, which in Simio are used to be able to have a pattern schedule that changes the capacity of an object over time.

Problems with this video? Click here to download it.